Net Metering Application for Interconnecting a Generating Facility No Larger than 25kW

 

This Application is considered complete when it provides all applicable and correct information required below. Additional information to evaluate the Application may be required.

 

Fees

 

An electrical permit and fee of $50 is required for system installation.

 

Interconnection Customer

 

Name: _______________________________________________________________________

Contact Person: ________________________________________________________________

Address: ______________________________________________________________________

City: ____________________________________State:________ Zip: ____________________

Telephone (Day): _____________________ (Evening):_________________________________

Fax: _____________________________E-Mail Address: _______________________________

 

Contact  (if different from Interconnection Customer)

Name: _______________________________________________________________________

Address: _____________________________________________________________________

City: ___________________________State: ________________ Zip: ____________________

Telephone (Day): ________________________ (Evening): _____________________________

Fax: ___________________________E-Mail Address: ________________________________

 

Owner of the facility (include % ownership by any electric Utility): _______________________

 

Generating Facility Information

Location (if different from above): _________________________________________________

Electric Service Company: _______________________________________________________

Account Number: ______________________________________________________________

Inverter Manufacturer: ________________________Model _____________________________

Interconnection inverter must be UL 1741 Listed.  Is the inverter UL1741 Listed?  Yes __ No __

Attach manufacturer’s cut-sheet showing UL1741 listing.

Nameplate Rating: _________(kW) ________ (kVA) ________ (AC Volts)

Single Phase _______ Three Phase ___________

System Design Capacity: _________ (kW) _______ (kVA)

Generation type:      Photovoltaic ___   Reciprocating Engine ___   Fuel Cell ___  Turbine __   Other ___

Energy Source:    Solar ___   Wind ___   Hydro ___   Diesel ___   Natural Gas ___   Fuel Oil ___

Other (describe) _________________________________________________________________

Estimated Installation Date: _____________   Estimated In-Service Date: ____________

Electrical schematic drawing must be included.  Link to drawing template.  Include provisions and show the location for the required lockable visible disconnect.

List components of the Generating Facility equipment package that are currently certified:

Equipment Type                                                Certifying Entity

1. ____________________                            _________________________

2. ____________________                            _________________________

3. ____________________                            _________________________

4. ____________________                            _________________________

5. ____________________                            _________________________

 

Interconnection Customer Signature

I hereby certify that, to the best of my knowledge, the information provided in this Application is true. I agree to abide by the Terms and Conditions for Interconnecting an Inverter-Based Small Generating Facility No Larger than 25 kW and return the Certificate of Completion when the Small Generating Facility has been installed.

 

Signed: ___________________________________________________________________

Print name: ________________________________________________________________ 

Title: ______________________________________ Date: ________________

 

---------------------------------------------------------------------------------------------------------------------

Contingent Approval to Interconnect the Generating Facility

(For Company use only)

Interconnection of the Generating Facility is approved contingent upon the Terms and Conditions for Interconnecting an Inverter-Based Generating Facility No Larger than 25kW.

 

Company Signature: __________________________________________________

Print name: ______________________________________ 

Title: _____________________________ Date: ___________________

Application ID number: __________________

Company waives inspection/witness test?  Yes ____No ____

 

 

Application   8-22-06