Net Energy Metering Interconnection AgreementThis
Net Energy Metering Interconnection Agreement is executed in duplicate this
_____ day of ___________________, 20___ between __________________________
(hereinafter referred to as "Customer"), and (Tacoma Power). Both parties, who
may be herein further referred to collectively as "Parties" and
individually as "Party", agree as follows:
1. CUSTOMER ELECTRIC GENERATING FACILITY
1. Customer has
elected, in accordance with RCW 80.60 et seq., to operate either a net energy
metering fuel cell, solar, wind or hydropower electric generating facility,
with a generating
capacity of not more than twenty-five kilowatts, in parallel with Tacoma
Power’s transmission and distribution facilities. The customer’s electric
generating facility (generating facility) is intended to offset either part or
all of the Customer's electrical requirements.
2. Tacoma Power will not
provide wheeling for Customer as generation from the net metering electrical
generating facility will only be applied to consumption at the location of said
electrical generating facility.
3.
Customer’s Application for Net Metered
Electrical Generation, including the location of the electrical generating
installation facility and details on the electrical generating unit(s) is
hereby incorporated into this agreement as Attachment A.
4.
The installation is identified by Tacoma Power with
the following designators: Transformer No. (feeder and phase)
_______________________ , Customer Account No.
_______________________ .
5.
A separate agreement shall be entered into for each
Customer’s electrical service location(s).
6.
The electrical generating system facility used by
the Customer shall be located on the Customer’s premises. It shall include all
equipment necessary to meet applicable safety, power quality, and
Interconnection requirements established by the National Electrical Code
(Articles 690 and 705), National Electrical Safety Code, the Institute of
Electrical and Electronics Engineers, Underwriters Laboratories, and Tacoma
Power’s Net Metering Interconnection Standards, as set forth in Attachment B,
which is attached hereto.
7.
Tacoma Power shall have the sole authority to
determine which Interconnection requirements set forth herein are applicable to Customer’s proposed generating facility.
2. PAYMENT FOR NET ENERGY
a.
Billed for the appropriate customer service charge
as other customers of Tacoma Power in the same rate class; and
b.
Credited for the net excess kilowatt-hours generated
during the billing period, with this kilowatt-hour credit appearing on
Customer’s bill for the following billing period.
3. INTERRUPTION OR REDUCTION OF DELIVERIES
1.
Tacoma Power may require Customer to interrupt or
reduce deliveries as follows:
a.
when necessary in order to construct, install,
maintain, repair, replace, remove, investigate, or inspect any of its equipment
or part of its system; or
b.
if it determines that curtailment,
interruption, or reduction is necessary because of emergencies, force or
compliance with prudent electrical practices.
2.
Whenever possible, Tacoma Power shall give Customer
reasonable notice of the possibility that interruption or reduction of
deliveries may be required.
3.
Notwithstanding any other provision of this
Agreement, if at any time Tacoma Power determines that either:
a.
the generating facility may endanger Tacoma Power personnel, or
b.
the continued operation of Customer's generating
facility may endanger the integrity of Tacoma Power's electric
system,
then Tacoma Power shall have the right to disconnect Customer's generating
facility from Tacoma Power’s electric system. Customer's generating facility
shall remain disconnected until such time as Tacoma Power is satisfied that the
condition(s) referenced in (a) of (b) of this section 3.3 have been corrected.
4. INTERCONNECTION
1.
Customer shall deliver the excess energy to Tacoma
Power at Tacoma Power’s meter.
2.
Customer shall pay for designing, installing,
inspecting, operating, and maintaining the electric generating facility in
accordance with all applicable laws and regulations and shall comply with
Tacoma Power’s Interconnection Standards set forth in Attachment B, which is
attached hereto.
3.
Customer shall pay for Tacoma Power’s standard
watt-hour meter electrical hook-up, if not already present.
4.
Customer shall not commence parallel operation of
the generating facility until written approval of the Interconnection
facilities has been given by Tacoma Power. Such approval shall not be
unreasonably withheld. Tacoma Power shall have the right to have
representatives present at the initial testing of Customer's protective
apparatus. Customer shall notify Tacoma Power when testing is to take place.
5. MAINTENANCE AND PERMITS
Customer shall:
6. ACCESS TO PREMISES
Tacoma
Power may enter Customer's premises or property to:
Tacoma Power inspection or other action
shall not constitute approval by Tacoma Power.
The customer remains solely responsible for the safe and adequate
operation of its facilities.
7. INDEMNITY AND LIABILITY
8. INDEPENDENT
CONTRACTORS
The Parties hereto are
independent contractors and shall not be deemed to be partners, joint ventures,
employees, franchisees or franchisers, servants or agents of each other for any
purpose whatsoever under or in Interconnection with this Agreement.
9. GOVERNING LAW
This Agreement shall be
interpreted, governed, and constructed under the laws of the State of
10. FUTURE MODIFICATION OR EXPANSION
Any future modification
or expansion of the Customer owned generating facility will require an
engineering review and approval by Tacoma Power. Tacoma Power reserves
the right to require the Customer, at Customer’s expense, to provide
modifications or additions to existing electrical devices including, but not
limited to protection device and meters, in the event of changes to government
or industry regulation and/or standards.
11. AMENDMENTS, MODIFICATIONS OR WAIVER
Any amendments or
modifications to this Agreement shall be in writing and agreed to by both
Parties. The failure of any Party at any time or times to require performance
of any provision hereof shall in no manner affect the right at a later time to
enforce the same. No waiver by any Party of the breach of any term or covenant
contained in this Agreement, whether by conduct or otherwise, shall be deemed
to be construed as a further or continuing waiver of any such breach or waiver
of the breach of any other term or covenant unless such waiver is in writing.
12. ASSIGNMENT
The Customer shall not
assign its rights under this Agreement without the express written consent of
Tacoma Power. Tacoma Power may impose reasonable conditions on any such
assignment to ensure that all of Customer’s obligations under this Agreement
are met and that none of Customer’s obligations under this Agreement are
transferred to Tacoma Power as a result of default, bankruptcy, or any other
cause.
13. APPENDICES
The Agreement includes
the following appendices attached and incorporated by reference:
Attachment
A: Application for Net Metered
Electrical Generation to
Attachment
B:
14. NOTICES
All written notices
shall be directed as follows:
________________________________________________
Customer Name
________________________________________________
Address
Customer notices to
Tacoma Power, pursuant to this Section 15, shall refer to the Service Address
set forth in Appendix A, Application for Net Metered Electrical Generation.
15. TERM OF AGREEMENT
This Agreement shall be
in effect when signed by the Customer and Tacoma Power and shall remain in
effect thereafter month to month unless terminated by either Party on thirty
(30) days' prior written notice in accordance with Section 13.
16. SIGNATURES
IN WITNESS WHEREOF, the
Parties hereto have caused two originals of this Agreement to be executed by
their duly authorized representatives.
This Agreement is
effective as of the last date set forth below.
CUSTOMER:
___________________________________ ___________________________________
Signature Signature
___________________________________ ___________________________________
Print
name Print
name
___________________________________ ___________________________________
Title Title
___________________________________ ___________________________________
Date Date